We can't find the internet
Attempting to reconnect
Something went wrong!
Hang in there while we get back on track
← All methods
CIBSE Guide E | Ch. 6 | Eq. 6.57
Height of the flame above the top of the opening
Height of the flame projection above the top of the opening
Reference
CIBSE (Chartered Institution of Building Services Engineers), 2019. CIBSE Guide E: Fire Safety Engineering. 4th edn. London: CIBSE.
Equations
z_{fo} = 12.8 \cdot (R / w)^{(2/3)} - h_{o}